OPAC
Perpustakaan
Integrity, Trust, Compassion
 Deskripsi Lengkap
 Kembali
No. Panggil : JIU-JIUIKB Januari 2008 Vol.1 No.1
Judul : Waktu Baku Proses Pembiatan Radiator Deutz BA 6M 816U
Pengarang : Sumadi
Penerbit dan Distribusi : Universitas IBN Khaldun Bogor p.29-36
Subjek :
Jenis Bahan : {007/00}
Lokasi : Limau
 
  • Ketersediaan
  • File Digital: 0
  • Ulasan Anggota
  • Sampul
  • Abstrak
Nomor Panggil No. Barkod Ketersediaan
JIU-JIUIKB Januari 2008 Vol.1 No.1 TERSEDIA
Ulasan Anggota:
Tidak ada ulasan pada koleksi ini: 47622
 Abstrak
Time which is needed to produce a product is depended to the difficulty level which faced in finishing product. It includes size a nd kind os its product, besides tools are used, employee and the method which applied, therefore it is very important to decided how long time in making that product. It is can be known with determine "Standart Time" in finishing the product. After determining standart time so it can be decided product conductivity time, cost variable, besides determine work schedule which needed. This written discusses "Standart Time Calculation" in producing: Deutz Radiator BA 6M 816U type.
|| Pengguna : Perpustakaan || Tampilan terbaik dengan  Firefox